ELECTRICAL engineering
Access to efficient sources of energy is critical to South Africa's economic well-being and growth. While 70% of the population has access to electricity - well above the SADC average of approximately 20% - nearly half of rural households do not have power. The South African government has prioritised performance in this sector, with a clear target of providing the entire country with electricity. To give effect to this intention, the electricity distribution industry is being restructured by consolidating suppliers into Regional Electricity Distributors or REDs.
PLUG INTO THE PROVEN APPROACH FOR BRINGING SUSTAINABLE POWER TO THE PEOPLE
Access by all South Africans to clean and efficient sources of energy is a critical national priority. Bigen Africa has an extensive track record in the successful delivery of even the largest and most complex bulk electrical services and electricity distribution infrastructure projects on time, to specification and within budget.
Our approach features the seamless integration of world class electrical engineering and utility management skills with expertise in network planning and design, project management and construction supervision. We work in close collaboration with our clients and all stakeholders, sharing risk and reward in genuine partnership and assisting them to achieve their long term social business performance objectives.
It's a proven approach.
It's a powerful approach.
It's a smarter business approach.
The National Electricity Regulator is supervising all electricity providers' progress towards this target. A section of the population is benefitting from the government's reduced electricity tariff for the poor; introduced in November 200I, thereby assisting in achieving the national energy efficiency targets.
BIGEN AFRICA is a leading multi-disciplinary group that provides engineering, management consulting and project finance solutions to a wide range of public and private sector clients. The company has built up extensive experience and expertise in bulk electrical services and electrical distribution infrastructure.
In addition to the design, documentation, administration and commissioning of electrical bulk distribution and infrastructure systems, we specialise in the following:
- Strategic and master planning of electrical bulk consumption;
- Requirements and infrastructure;
- Electrical load studies;
- Energy efficiency studies;
- Feasibility studies for new infrastructure development;
- Technical inputs for bulk services and distribution;
- Layout planning;
- Total cost analyses of proposals, including capital cost;
- Operation and maintenance cost, and the cost impact on users;
- Project financing and cost recovery;
- Electrical system protection;
- Electrical network asset management;
- Policy issues and institution support.
Our Value-Add Proposition
Our integrity commitment, desire to serve, passion for excellence and empowerment, innovative and creative working environment provides our specialist, multidisciplinary teams with a solid foundation to implement successful projects for clients.
Our Track Record
BIGEN AFRICA has been involved in an extensive range of electrical infrastructure projects. We have successfully completed the planning, design, project management and construction supervision of large-scale projects for a number of clients. Our services include development planning and design, costing, process implementation to direct and manage existing infrastructure growth, key intervention, process identification and implementation to guide public funding and preparation of proposals for upgrading and developing electrical infrastructure.
The BIGEN AFRICA Electrical Engineering Team
The electrical engineering team has the experience, capability and expertise to provide clients with professional services and customised solutions in all electrical projects.
Areas of expertise: Electrical engineering, electrification design, asset management, energy efficiency and project management.
The team: Team leader Corrie van der Wath (Pr Tech Eng, Pr CPM) is a graduate professional electrical technologist with 18 years experience in electrical engineering. Team members are Anton Booyzen (Pr Eng), GCC, Johan Pieters (Pr Eng), CEM, CEA Frans Senyatsi (Pr Eng), Otlotleng Gaobepe and Piet Steyn (Associate Director).
The electrical engineering team has access to a network of professionals who provide knowledge and expertise to support the execution of specialised projects.
Vlakfontein Electrification and Street Lighting Client: City Power. Turn-key project that encompassed all aspects of design, project management and construction for the electrification of 4 000 household stands and the provision of street lighting for the entire township located in the western suburbs of Johannesburg. This included the design of bulk electrical supply to the township, MV line routing within the township and electrical power reticulation design to each household. Careful design considerations allowed for the simultaneous implementation of street lighting in the area. The beneficiaries are from the poorer spectrum of the South African community and the project supported government’s reconstruction and development vision.
Roodeplaat Water Supply Scheme The project entailed a comprehensive, detailed design of the electrical requirements for the Temba Roodeplaat Water Supply Scheme to increase the available maximum energy supply capacity to the Roodeplaat Water Treatment Works from an existing 3.2MVA to 8.2MVA. This was done by extending the existing Zeekoegat sub-station and providing new sub-stations at the newly constructed high-lift pumpstation and raw water treatment works. The design provided for 11kV bulk supply from the Pumulani 88/11kV substation to the respective plants and incorporated the various protection schemes and devices.
Nonyane Sub-station The existing Nonyane sub-station was overloaded and regular outages occurred, especially during winter. A new 33/11kV sub-station, consisting of two 10MVA transformers, was planned and constructed. The immediate problem was resolved by installing a temporary 33/11kV, 5MVA transformer in the existing sub-station while completing the new sub-station.
Winterveldt to Vuka 33kV line This project involved the design, procurement, construction and project management of approximately 6.1km of single-circuit 33kV “Kingbird” line teeing off from the Winterveldt, Mabopane East line to Vuka sub-station. The line supplies approximately 50MVA to the Winterveldt area and provided 50 000 new households with electricity.
Master Plan Development The purpose of the master plan is to provide a single document, highlighting the various electricity infrastructure development needs. It identifies the varied programmes and project timeframes of stakeholders, and highlights the measurable deliverables on short-term, mid-term and long-term bases.
Asset Management In the current economic climate, capital to install new infrastructure is becoming scarce. The Bigen Electrical Asset Management process is tailored to ensure that clients, in particular local authorities, derive the maximum benefit from their assets.
Design and Construction Projects
BIGEN AFRICA provides design and construction supervision directly or with joint-venture partners. The turnkey design and construction methodology was refined by BIGEN AFRICA in 2002. This included setting up a legal framework and contractual basis for the contracts as well as the development of reporting structures and standardised documentation and procedures. Since the inception of the turnkey design and construct programme in 2002, BIGEN AFRICA has refined the turnkey contract structure to suit various local government structures and varying types of work.
| PROJECT |
DESCRIPTION |
PERIOD |
BUDGET |
| Electrification of Pennyville Township |
Electrification of new township developments in the area and the design of an additional 88/11kV sub-station for bulk supply requirements. |
2006 - 2009 |
R60 million |
| Electrification of Lehae Township |
Electrification of 3000 stands and the development of an 88/11kV sub-station for bulk supplies. |
2008 - 2010 |
R20 million |
| Electrification of Soshanguve Township |
Jointly conducted with a private development consortium, with the local community and local government as stakeholders. This project comprised the development of mixed bonded and subsidised government housing on 15 000 stands, implemented in a phased manner. Other facilities and amenities envisaged include business areas. |
2006 - 2010 |
R150 million |
| Electrification of Alexandra X7 Township |
Electrification of 1400 stands and the installation of public lighting. |
2008 - 2009 |
R12 million |
| Electrification of Olievenhoutbosch Township |
The electrification of 6 000 stands, which is part of the further development of Olievenhoutbosch Township between Johannesburg and Tshwane. |
2006 - 2008 |
R60 million |
| Electrification of Kosmosdal Township |
The project comprised the mixed development of approximately 1 000 residential stands and three industrial areas. |
2006 - 2008 |
R30 million |
| Electrification of Doornkop Greenfields |
Client: City Power. The project is the largest by for the client. The scope involves the provision of electricity supplies, both at MV and LV, for about 20 000 end-consumers in an area that is being developed as a mixed residential township and wide amenity and business site cluster. Bulk supply with Eskom have been concluded for the provision of the supply point at 132kV. |
2007 - 2011 |
R300 million |
| Upgrade of four 88kV Eskom Traction Sub-stations |
88kV Traction sub-station refurbishments |
2009 - 2010 |
R13 million |
| Upgrade of 88kV Eskom Substation |
88/11kV sub-station |
2009 - 2010 |
R9 million |
| Electrification of Kameelputs Township |
Electrification of 850 stands. |
2009 - 2010 |
R7,5 million |
| Electrification of Masilo Township |
Electrification of 450 stands. |
2009 - 2010 |
R4 million |
| Network Master Planning |
Network master planning for Lepalale Municipality. |
2007 - 2008 |
R0,35 million |
| Network Master Planning |
Network master planning for Blue Crane Municipality. |
2006 - 2007 |
R0,25 million |
| Network Master Planning |
Network master planning for Sol Plaatje Municipality. |
2009 - 2010 |
R2,5 million |
| Electrification of Lerato Park |
The project comprised the mixed development of approximately 5 600 residential stands and industrial areas. |
2009 - 2010 |
R100 million |
| Koffiefontein substation |
Installation of new 10 MVA transformer. |
2009 - 2010 |
R16 million |
| Canal sub-station |
Installation of new 20 MVA transformer, transformer and tap change schemes, protection, metering and scada. |
2009 - 2010 |
R25 million |
| Ficksburg Municipality |
Upgrade protection, metering and scada. |
2009 - 2010 |
R16 million |
| Pretoria Soshanguve substation |
Installation of four new 40 MVA transformer sub and tap change schemes, protection, metering and designs. |
2009 - 2010 |
R120 million |
Contact PERSONS
Johan Pieters (PR Eng) CEM CEA : Associate Director Tel: +27 (0)51 430 1423 Fax: +27 (0)51 447 0352 Email: johan.pieters@bigenafrica.com
Piet Steyn Associate Director : Technologist Tel: +27 (0) 51 – 430 1423 Fax: +27 (0) 51 – 447 0352 Email: piet.steyn@bigenafrica.com
|